Road Work Scheduled

Road Paving will occur from October 16, 2017 through October 22, 2017. Please see below for areas with daily no parking restrictions from 7AM to 5PM during that time period:

98th Street to 110th Street; beach block; 100 block; 200 block; south side of street

111th Street; beach block; 100 block; 200 block; north side of street

Sunrise Drive; 10100 block through the 10300 block; west side of street

Corinthian Drive; 9800 block; west side of street

98th Street; 400 block; north side of street

Sunset Drive; 9800 block; west side of street