July 19, 2023

BEACH CLOSURE AND BEACH NOURISHMENT UPDATE

–  The 123rd Street crossover, beach and parking lot are currently closed for demobilization operations.

– The Dredge, Texas, & Booster are currently off site at the Cape May Inlet.

– The subline landing in Stone Harbor at 91st Street has been taken offshore this morning.

– The disassembling of shore pipes from south to north is complete, with exception of the long sections of pipe between 115th and 119th Streets. Those pipes are  in the process of being cut  and will be consolidated at 123rd Street beach with the rest of the stored shore pipe.

– Demobilization of equipment, pipe and supplies is in progress via 123rd street.

– Dredge Texas pumped: 727,755 CY, 100% complete (per GLDD).

– Beach fill operation completed as of July 17, 2023.